Avon Dam Road Bridge Replacement

01/05/2024
01/05/2024 Samantha

As a flow-on Contract to our flagship Greater Sydney Bridges Upgrade Project, WaterNSW engaged Select Civil for the demolition, design and construction of a replacement bridge for the Avon Dam Road crossing at Nepean River.

The bridge was originally constructed from timber in the 1930’s, however was upgraded to precast concrete planks on mass-poured concrete piers in the 1980’s. Part of Select’s design scope was to retain and utilise the existing concrete piers into the structure, to minimize environmental footprint and construction timeframe.

Select and our engineering design team, Cardno, developed an integrated rock-anchor system that connected new bridge superstructure componentry to the underlying sandstone bedrock for additional strength. This would be paired with PSC concrete headstocks and transversely stressed planks, and bring the load rating of a new structure up to the current SM1600 loading configuration.

The project was successfully handed over to Client in 2022, with all stakeholders satisfied. In recognition of the team’s hard work, in 2022 Select won both the NSW and National Civil Contractors Federation Earth Award for excellence in Civil Construction in the $2-$5mil category.

  • Client

    WaterNSW

  • Area

    Avon Dam Road, Bargo

  • Value

    $3.2M

  • Duration

    1 year – Completion June 2021