Since 2003 Select have remediated 5 Vent Shaft & Mine Portal Sites for BHP / Illawarra Coal, these projects include;
- Kemira Mine Portal
- Port Kembla No 2 Shaft
- Nebo Shafts 1 & 2
- Corrimal No2 Shaft
- Bulli No 4 Shaft
The remediation of these sites involves overcoming various potential issues such as Mine Gasses, Remote locations, Lack of Communications, Bush Fire Hazard, Difficult access & terrain and work in National Parks & SCA property requiring a high level of environmental planning.
A usual component for the projects is the removal of old power lines & poles from inaccessible areas on the Illawarra escarpment. Select Civils recent project for the remediation of Bulli No4
Shaft included the removal of 117 disused poles from bush areas [detailed in pictures below].
Other projects such as the Corrimal No2 shaft included the filling & capping of a 450m deep ventilation shaft.
The first project carried out by Select was the remediation of the Mt Kemira Portal & stabilisation of the excavated material at the site. This project involved construction of a large cascade below the portal to control runoff in heavy weather conditions.
Client
BHP / Illawarra Coal
Area
Illawarra Escarpment
Value
$750K
Duration
Jun 2011 - Jul 2012